Environmental

At The PSA Group, we specialise in environmental monitoring, tracking, and remediation, combining years of expertise in the fuelling industry with a commitment to regulatory compliance.

Understanding that each site presents unique challenges, we approach every project with tailored solutions designed to identify, address, and resolve contamination issues efficiently. Our process begins with a thorough site analysis to ensure safe and compliant operations, setting the foundation for effective remediation if required.

Engineer in high-visibility gear using a tablet to inspect underground pipelines in a trench. This image showcases the critical work of monitoring and maintaining infrastructure.

Site analysis

At The PSA Group, we conduct thorough environmental site assessments for service station sites, ensuring compliance with the Australian Guidelines for the Assessment and Management of Contaminated Sites, as well as EPA requirements. Using a risk-based approach, we help identify and address any potential contamination issues to ensure regulatory compliance. Identifying contamination early can prevent costly challenges, which is why an environmental site assessment is imperative in our operations.

Site treatment

Once the site analysis is complete, we commence our site remediation services, if necessary. Our process begins with detailed testing to identify contaminants and assess the scope of the issue. In collaboration with environmental engineering consultancies like FYFE, we develop customised remediation plans to address the specific challenges of each site. On-site, we isolate affected areas, establish safety zones, and apply advanced chemical treatments or soil turnover techniques to eliminate contamination.

Depending on the site requirements, we can utilise injection systems to treat the soil or safely remove and dispose of contaminated materials, ensuring the site meets environmental standards.

iStock-1345469125
Environmental services include:

Civil works & in-house earth moving

Prevention and remediation of contamination (Both Solid and Liquid)

Treatment and disposal of contamination (Both Solid and Liquid)

Full site temporary and permanent decommissioning

Wellpoint dewatering

Trench, pump station and manhole shoring boxes

Sheet pile / beam sets for large excavations

Steel road and footpath plates

Sewer bypass and infrastructure pumping

Trailer mount quick response pumps and hoses

Excavator/skid steer hire with operators only

Water sampling/ testing at NATA accredited laboratories

Water sampling/ testing at NATA accredited laboratories